








BSI BMP 773486 audit passed every year鈥攓uality you can trust.

F11 LVL Rim-BoardS鈥擯erfect Match to 300 脳 45 Studs, One-Stop Wall Package!
Upgrade Old Hardwood鈥擣11 LVL Slides into 90 mm Walls, No Packing Required.
Sell the Look, Keep the Budget鈥擡xposed F11 LVL Ceiling Rafters, Clear-Coat Ready.
Termite Warranty 25 Yr鈥擧2-S F11 LVL Backed by BSI BMP 773486 Certificate.
Mix-Grade Savings鈥擴se F11 for Joists, F17 for Beams, Cut Overall Timber Cost 12 %.







F11 Structural LVL 鈥� Quick Spec Sheet (AS/NZS 4357.0)
Grade: F11
Characteristic bending strength (fb): 43 MPa
Characteristic shear strength (fs): 5.0 MPa
Characteristic compression 鈯� (fc,鈯�): 18 MPa
Characteristic compression 鈭� (fc,鈭�): 35 MPa
Mean modulus of elasticity (E): 10,500 MPa (hence 鈥淓10.5鈥�)
5th-percentile modulus (E0.05): 9,100 MPa
Characteristic density: 600 kg/m鲁
Standard section tolerances: 卤0.5 mm thickness / 卤1 mm depth
Maximum stocked length: 12 m (custom cut)
Moisture content at dispatch: 10鈥� %
Treatment: H2-S (LOSP) or H3 (CCA/ACQ) 鈥� 25 yr above ground / 50 yr enclosed
Adhesive bond: WBP phenolic 鈥� 72 h boil-proof (AS/NZS 2098.7 pass)
Fire char rate: 0.60 mm min鈦宦� (AS 1720.4)
Fastener: 75 % of nailed steel capacity vs. solid pine






- F11 LVL Beams鈥� MPa Strength, 30 % Lighter Cost than F17, Same 12 m Span!
- Skip Steel, Save Cash: F11 300 脳 63 mm Carries 4.8 m Floor at Half the Weight.
- H2-S Termite-Proof F11 Joists鈥擱eady for Sydney Frames
- Budget-Smart Mezzanine? F11 LVL Gives E10.5 Stiffness without Over-Engineering.
- 72-Hour Boil-Proof
- Stock Lengths 2.4鈥�5 m, Custom Cut to 50 mm鈥擣11 Joists Fit Any Aussie Blueprint.
- From Darwin to Hobart鈥擧3-Treated F11 LVL Handles Climate Extremes, No Twist.
- Nail, Screw or Bolt鈥擣11 LVL Accepts All Fasteners; No Pre-Drilling, No Split.
- Frame Tomorrow鈥擬ill-Direct F11 LVL, Save 15 % vs Retail Yard Price.